Knowledge

Automatic welding equipment maintenance method

Apr 15, 2020 Leave a message

Piston Rod Welding Machhine-01-17-yin-s


1.The guide rails of each movable part in the main machine must be filled with high temperature butter (300℃), and the cycle is once a week.


2. Brush the earphones and cut the guide rails of the earphones and fill with ordinary grease, the cycle is once a week.

3. The movable guide rod of the fixture is lubricated with oil, and the fixture can move flexibly.

4. Check the four positioning pins of the fixture. If lead is stuck to the positioning surface of the pins, it must be cleaned in time, otherwise the quality of casting and welding will be affected.

5. Check the welding points of the four positioning pins of the fixture. This welding point may be broken after long-term use. If it is broken, it can be used normally after welding.

6. Check the oil and water in the water cup in the air source triplet. If the water level exceeds the red line, the oil and water must be discharged.

7. Check the oil in the oil cup in the air source triplet. If the oil level is lower than the minimum line, you must add engine oil (the oil drop rate of the oil mist device is 10 seconds/drop).

8. Check the water level in the water tank. If the water level is higher than the highest line or lower than the lowest line, the equipment must be stopped.


Send Inquiry